en  de fr es nl 

Construction

The construction industry may be exposed to significant cost overruns related to project delays and penalties due to adverse weather.

Examples of the most common weather risk factors are:

Temperature: Concrete work, paving, wall construction, and paint jobs can only be done when temperatures range between 5 and 25 degrees. Excavation jobs cannot be done in permafrost conditions.

Rain: External painting cannot be done in wet conditions. Structural work or excavation activities are often delayed by rain.

Download sample calculation for the construction industry

Back to Industries

industries

Any Questions?

faq
 

Follow us  Follow CelsiusPro on Twitter  | Privacy | Legal Lavaterstrasse 44 | CH-8002 Zurich | +41 44 205 99 10 | info@celsiuspro.com Copyright @2011 CelsiusPro